{"id":937,"date":"2023-12-22T12:33:00","date_gmt":"2023-12-22T12:33:00","guid":{"rendered":"https:\/\/arenso.fi\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/"},"modified":"2024-08-26T11:29:50","modified_gmt":"2024-08-26T11:29:50","slug":"tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat","status":"publish","type":"post","link":"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/","title":{"rendered":"Tahkoluoto offshore wind farm Extension project\u2019s demo phase is granted water and building permits"},"content":{"rendered":"\n<p><strong>Suomen Hy\u00f6tytuuli is&nbsp;<\/strong><strong>planning<\/strong><strong>&nbsp;an&nbsp;<\/strong><strong>E<\/strong><strong>xtension&nbsp;<\/strong><strong>project&nbsp;<\/strong><strong>to Tahkoluoto offshore wind farm on the west<\/strong><strong>ern<\/strong><strong>&nbsp;coast of Finland.&nbsp;<\/strong><strong>Tahkoluoto offshore wind farm is the world\u2019s first offshore wind farm in frozen sea conditions.<\/strong><\/p>\n\n\n\n<p>Tahkoluoto Extension offshore wind farm will be located 4\u201322 kilometres off the coast of Pori, in Western Finland. In the demonstration project phase, two wind turbines will be built to pilot new, large-scale offshore wind turbines and a foundation concept for deep waters in frozen sea conditions. The demonstration phase of the Extension project has now been granted water and building permits.<\/p>\n\n\n\n<p>\u201cThis is the first time that permits have been granted for wind turbines of this scale in Finland. It was important for us to ensure that the detailed understanding of the marine life that we gathered during the environmental impact assessment and land use planning, have been taken into account in the permitting\u201d, says Juho Lappalainen, Project Development Manager for Tahkoluoto Offshore Extension project. \u201dNaturally, we also have to monitor the environmental impacts comprehensively during the construction phase and the initial stages of production.\u201d<\/p>\n\n\n\n<p>\u201dWith the building and water permits in force, the investment decision is close at hand. Next, we will verify the pricing and availability of the critical components of the project, after which we are ready to proceed to the implementation phase\u201d, says Manu Gr\u00f6nlund, Project Director of the Tahkoluoto Offshore Extension demonstration project.<\/p>\n\n\n\n<p>The findings of the demonstration project will be applied to the Tahkoluoto Extension project, which consists of forty wind turbines of over 15 megawatts. The construction phase is planned for 2027\u20132029. The total capacity of the wind farm will be 600\u2013800 MW.<\/p>\n\n\n\n<p>The construction of the first turbines of the extension project has received funding from EU\u2019s NextGenerationEU.<\/p>\n\n\n\n<p><a href=\"https:\/\/hyotytuuli.fi\/en\/suomen-hyotytuuli-starts-feed-for-turbine-foundations-in-tahkoluoto-offshore-wind-farm-extension-project\/\">Suomen Hy\u00f6tytuuli starts FEED for turbine foundations in Tahkoluoto Extension project<\/a><\/p>\n\n\n\n<p><a href=\"https:\/\/hyotytuuli.fi\/en\/suomen-hyotytuuli-receives-a-grant-of-30-000-000-euro-for-tahkoluoto-offshore-wind-power-demo-project\/\">Tahkoluoto receives a grant of 30 million euro for Tahkoluoto offshore wind power demo project<\/a><\/p>\n\n\n\n<p><a href=\"https:\/\/media.hyotytuuli.fi\/public\/category\/8\">Tahkoluoto offshore wind farm \u2013 Suomen Hy\u00f6tytuuli\u2019s image bank<\/a><\/p>\n\n\n\n<p><strong>Further information:<\/strong><\/p>\n\n\n\n<p>Business Director Esa Holttinen, tel. +358 44 760 8477, esa.holttinen(at)arenso.fi<\/p>\n\n\n\n<p>Project Development Manager Juho Lappalainen, tel. +358 50 560 7284, juho.lappalainen(at)arenso.fi<\/p>\n\n\n\n<p>Project Director Manu Gr\u00f6nlund, tel. +358 40 074 0242, manu.gronlund(at)arenso.fi<\/p>\n\n\n\n<p><strong><em>Suomen Hy\u00f6tytuuli Oy<\/em><\/strong><em>&nbsp;is a Finnish renewable energy production company and a pioneer in offshore wind power. It is owned by eight city energy companies in Finland. The company has seven wind farms in operation and three under construction. It develops, plans and builds wind farms and operates them through its partner network. The Tahkoluoto Extension project continues Suomen Hy\u00f6tytuuli\u2019s investments in offshore and onshore wind power.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Suomen Hy\u00f6tytuuli is&nbsp;planning&nbsp;an&nbsp;Extension&nbsp;project&nbsp;to Tahkoluoto offshore wind farm on the western&nbsp;coast of Finland.&nbsp;Tahkoluoto offshore wind farm is the world\u2019s first offshore wind farm in frozen sea conditions. Tahkoluoto Extension offshore wind farm will be located 4\u201322 kilometres off the coast of Pori, in Western Finland. In the demonstration project phase, two wind turbines will be built [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":682,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-937","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tahkoluoto offshore wind farm Extension project\u2019s demo phase is granted water and building permits - Arenso<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tahkoluoto offshore wind farm Extension project\u2019s demo phase is granted water and building permits - Arenso\" \/>\n<meta property=\"og:description\" content=\"Suomen Hy\u00f6tytuuli is&nbsp;planning&nbsp;an&nbsp;Extension&nbsp;project&nbsp;to Tahkoluoto offshore wind farm on the western&nbsp;coast of Finland.&nbsp;Tahkoluoto offshore wind farm is the world\u2019s first offshore wind farm in frozen sea conditions. Tahkoluoto Extension offshore wind farm will be located 4\u201322 kilometres off the coast of Pori, in Western Finland. In the demonstration project phase, two wind turbines will be built [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/\" \/>\n<meta property=\"og:site_name\" content=\"Arenso\" \/>\n<meta property=\"article:published_time\" content=\"2023-12-22T12:33:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-26T11:29:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/hyotytuuli.fi\/app\/uploads\/sites\/2\/2024\/08\/20230711-2123131-scaled.jpg.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1441\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"mscadmin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"mscadmin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\\\/\"},\"author\":{\"name\":\"mscadmin\",\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/#\\\/schema\\\/person\\\/3c4b9ff19932ba5d289505e9f39abc70\"},\"headline\":\"Tahkoluoto offshore wind farm Extension project\u2019s demo phase is granted water and building permits\",\"datePublished\":\"2023-12-22T12:33:00+00:00\",\"dateModified\":\"2024-08-26T11:29:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\\\/\"},\"wordCount\":455,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arenso.fi\\\/app\\\/uploads\\\/sites\\\/2\\\/2024\\\/08\\\/20230711-2123131-scaled.jpg.webp\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/arenso.fi\\\/en\\\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\\\/\",\"url\":\"https:\\\/\\\/arenso.fi\\\/en\\\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\\\/\",\"name\":\"Tahkoluoto offshore wind farm Extension project\u2019s demo phase is granted water and building permits - Arenso\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/arenso.fi\\\/app\\\/uploads\\\/sites\\\/2\\\/2024\\\/08\\\/20230711-2123131-scaled.jpg.webp\",\"datePublished\":\"2023-12-22T12:33:00+00:00\",\"dateModified\":\"2024-08-26T11:29:50+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/arenso.fi\\\/en\\\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\\\/#primaryimage\",\"url\":\"https:\\\/\\\/arenso.fi\\\/app\\\/uploads\\\/sites\\\/2\\\/2024\\\/08\\\/20230711-2123131-scaled.jpg.webp\",\"contentUrl\":\"https:\\\/\\\/arenso.fi\\\/app\\\/uploads\\\/sites\\\/2\\\/2024\\\/08\\\/20230711-2123131-scaled.jpg.webp\",\"width\":2560,\"height\":1441,\"caption\":\"Tahkoluodon merituulipuisto \\\/ Tahkoluoto offshore wind farm\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/arenso.fi\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tahkoluoto offshore wind farm Extension project\u2019s demo phase is granted water and building permits\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/arenso.fi\\\/en\\\/\",\"name\":\"Arenso\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/arenso.fi\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/#organization\",\"name\":\"Arenso\",\"url\":\"https:\\\/\\\/arenso.fi\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/hyotytuuli.fi\\\/app\\\/uploads\\\/sites\\\/2\\\/2024\\\/08\\\/arenso-no-slogan_color-nega.png\",\"contentUrl\":\"https:\\\/\\\/hyotytuuli.fi\\\/app\\\/uploads\\\/sites\\\/2\\\/2024\\\/08\\\/arenso-no-slogan_color-nega.png\",\"width\":3000,\"height\":616,\"caption\":\"Arenso\"},\"image\":{\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/arenso.fi\\\/en\\\/#\\\/schema\\\/person\\\/3c4b9ff19932ba5d289505e9f39abc70\",\"name\":\"mscadmin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/deca10238b1a8aad39b527f26cfe4ce4f9a8affad032c8141ae4471de5fc9fab?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/deca10238b1a8aad39b527f26cfe4ce4f9a8affad032c8141ae4471de5fc9fab?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/deca10238b1a8aad39b527f26cfe4ce4f9a8affad032c8141ae4471de5fc9fab?s=96&d=mm&r=g\",\"caption\":\"mscadmin\"},\"sameAs\":[\"https:\\\/\\\/hyotytuuli.fi\\\/wp\"],\"url\":\"https:\\\/\\\/arenso.fi\\\/en\\\/author\\\/mscadmin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tahkoluoto offshore wind farm Extension project\u2019s demo phase is granted water and building permits - Arenso","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/","og_locale":"en_US","og_type":"article","og_title":"Tahkoluoto offshore wind farm Extension project\u2019s demo phase is granted water and building permits - Arenso","og_description":"Suomen Hy\u00f6tytuuli is&nbsp;planning&nbsp;an&nbsp;Extension&nbsp;project&nbsp;to Tahkoluoto offshore wind farm on the western&nbsp;coast of Finland.&nbsp;Tahkoluoto offshore wind farm is the world\u2019s first offshore wind farm in frozen sea conditions. Tahkoluoto Extension offshore wind farm will be located 4\u201322 kilometres off the coast of Pori, in Western Finland. In the demonstration project phase, two wind turbines will be built [&hellip;]","og_url":"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/","og_site_name":"Arenso","article_published_time":"2023-12-22T12:33:00+00:00","article_modified_time":"2024-08-26T11:29:50+00:00","og_image":[{"width":2560,"height":1441,"url":"https:\/\/hyotytuuli.fi\/app\/uploads\/sites\/2\/2024\/08\/20230711-2123131-scaled.jpg.webp","type":"image\/webp"}],"author":"mscadmin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"mscadmin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/#article","isPartOf":{"@id":"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/"},"author":{"name":"mscadmin","@id":"https:\/\/arenso.fi\/en\/#\/schema\/person\/3c4b9ff19932ba5d289505e9f39abc70"},"headline":"Tahkoluoto offshore wind farm Extension project\u2019s demo phase is granted water and building permits","datePublished":"2023-12-22T12:33:00+00:00","dateModified":"2024-08-26T11:29:50+00:00","mainEntityOfPage":{"@id":"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/"},"wordCount":455,"commentCount":0,"publisher":{"@id":"https:\/\/arenso.fi\/en\/#organization"},"image":{"@id":"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/#primaryimage"},"thumbnailUrl":"https:\/\/arenso.fi\/app\/uploads\/sites\/2\/2024\/08\/20230711-2123131-scaled.jpg.webp","articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/","url":"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/","name":"Tahkoluoto offshore wind farm Extension project\u2019s demo phase is granted water and building permits - Arenso","isPartOf":{"@id":"https:\/\/arenso.fi\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/#primaryimage"},"image":{"@id":"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/#primaryimage"},"thumbnailUrl":"https:\/\/arenso.fi\/app\/uploads\/sites\/2\/2024\/08\/20230711-2123131-scaled.jpg.webp","datePublished":"2023-12-22T12:33:00+00:00","dateModified":"2024-08-26T11:29:50+00:00","breadcrumb":{"@id":"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/#primaryimage","url":"https:\/\/arenso.fi\/app\/uploads\/sites\/2\/2024\/08\/20230711-2123131-scaled.jpg.webp","contentUrl":"https:\/\/arenso.fi\/app\/uploads\/sites\/2\/2024\/08\/20230711-2123131-scaled.jpg.webp","width":2560,"height":1441,"caption":"Tahkoluodon merituulipuisto \/ Tahkoluoto offshore wind farm"},{"@type":"BreadcrumbList","@id":"https:\/\/arenso.fi\/en\/tahkoluodon-merituulipuiston-laajennuksen-demohankkeelle-rakennus-ja-vesiluvat\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/arenso.fi\/en\/"},{"@type":"ListItem","position":2,"name":"Tahkoluoto offshore wind farm Extension project\u2019s demo phase is granted water and building permits"}]},{"@type":"WebSite","@id":"https:\/\/arenso.fi\/en\/#website","url":"https:\/\/arenso.fi\/en\/","name":"Arenso","description":"","publisher":{"@id":"https:\/\/arenso.fi\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/arenso.fi\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/arenso.fi\/en\/#organization","name":"Arenso","url":"https:\/\/arenso.fi\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/arenso.fi\/en\/#\/schema\/logo\/image\/","url":"https:\/\/hyotytuuli.fi\/app\/uploads\/sites\/2\/2024\/08\/arenso-no-slogan_color-nega.png","contentUrl":"https:\/\/hyotytuuli.fi\/app\/uploads\/sites\/2\/2024\/08\/arenso-no-slogan_color-nega.png","width":3000,"height":616,"caption":"Arenso"},"image":{"@id":"https:\/\/arenso.fi\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/arenso.fi\/en\/#\/schema\/person\/3c4b9ff19932ba5d289505e9f39abc70","name":"mscadmin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/deca10238b1a8aad39b527f26cfe4ce4f9a8affad032c8141ae4471de5fc9fab?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/deca10238b1a8aad39b527f26cfe4ce4f9a8affad032c8141ae4471de5fc9fab?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/deca10238b1a8aad39b527f26cfe4ce4f9a8affad032c8141ae4471de5fc9fab?s=96&d=mm&r=g","caption":"mscadmin"},"sameAs":["https:\/\/hyotytuuli.fi\/wp"],"url":"https:\/\/arenso.fi\/en\/author\/mscadmin\/"}]}},"_links":{"self":[{"href":"https:\/\/arenso.fi\/en\/wp-json\/wp\/v2\/posts\/937","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arenso.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arenso.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arenso.fi\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/arenso.fi\/en\/wp-json\/wp\/v2\/comments?post=937"}],"version-history":[{"count":1,"href":"https:\/\/arenso.fi\/en\/wp-json\/wp\/v2\/posts\/937\/revisions"}],"predecessor-version":[{"id":938,"href":"https:\/\/arenso.fi\/en\/wp-json\/wp\/v2\/posts\/937\/revisions\/938"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arenso.fi\/en\/wp-json\/wp\/v2\/media\/682"}],"wp:attachment":[{"href":"https:\/\/arenso.fi\/en\/wp-json\/wp\/v2\/media?parent=937"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arenso.fi\/en\/wp-json\/wp\/v2\/categories?post=937"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arenso.fi\/en\/wp-json\/wp\/v2\/tags?post=937"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}